OT management software schedules surgeries, assigns theatres and surgeons without overlaps, tracks pre-anaesthesia checks (PAC), records procedures and consumables, manages post-operative recovery and posts surgical charges to the bill. It reduces cancellations, idle theatre time and unbilled implants and consumables.
The operation theatre is the most expensive room in the hospital. Scheduling and consumable control there have an outsized effect on both efficiency and revenue.
This is one part of a connected hospital management system.
PostgreSQL btree_gist exclusion constraints reject overlapping theatre or surgeon bookings.
Pre-anaesthesia status recorded before a case proceeds.
Procedures, implants and consumables logged against the case.
Post-op transitions and observations.
Generated from the surgical and ward record.
Charges surface in the unbilled pool automatically.
It keeps one live calendar for theatres, surgeons and equipment, rejects overlaps, applies buffer times and links each case to PAC, the admission and billing.
PAC is the pre-anaesthesia check, in which the anaesthetist assesses a patient's fitness for anaesthesia before surgery.
Book a free walkthrough and we will map your departments, rates and discharge process to a working QureSetu setup.
Book a Free HMS Demo